CleverClass®

CleverClass® is a range of innovative, energy-efficient buildings designed and manufactured for the education sector. Constructed off-site using high-performing materials and designed with the latest digital technology, CleverClass® is an energy efficient solution to both short and medium term requirements.

So whether you need a modular classroom to accommodate an increase in pupil numbers or to use as temporary accommodation whilst your new school is getting constructed you can rely on McAvoy to delivery a high quality solution on budget and on time.

  • Facility CleverClass® for primary and secondary education
  • Building Size 98m2
  • Location UK and Ireland

The use of CleverClass® modular classrooms delivers enhanced economic, environmental and social benefits. Smart Offsite® construction offers higher quality control standards due to manufacture in a factory, improved health and safety, delivered on time and budget and minimal disruption to the live school environment.

The combination of a highly insulated building envelope, near passive air tightness, air sourced heat pump heating and ventilation, dual flush toilets and
PIR sensored, auto-dimming lighting ensures that energy consumption and running costs are minimised.

With a typical energy performance rating of B31 and carbon emissions of 18Kg CO2/m2 the running cost of a double classroom is less than £240 per year.*

Available in single, double and 2 storey classroom formats the CleverClass® modular accommodation is an adaptable and flexible solution to the challenges of changing demographics and demand for school places.

*Based on a double classroom with an air sourced heat pump.

The Customer Perspective

“The McAvoy Group provided a very professional and efficient service from start to finish. The site foreman and workers were approachable, knowledgeable and kept us up to date throughout. Despite there being
children on site for a large part of the build, the work was carried out considerately and there was no impact on the school or children with
this work going on. Snags have been followed up promptly and overall the school governors and I are very happy with the finished classroom. I would
happily recommend The McAvoy Group to others. “

Opening Quotes
Christopher Baines
Headteacher
Closing Quotes
Howden le Wear Primary School

“Delivered to a very high standard within time and budget. McAvoy were accommodating, delivering and installing the buildings on site at
the school. The internal finishes and fixtures within the buildings are of very high quality. The quality of the doors, toilet facilities, flooring and lighting are all well suited for creating a learning environment suitable for autistic
children. The Local Authority had specific requirements for lighting and acoustics which were fulfilled.

McAvoy also provided a customised exterior design for the buildings along with good access and exterior works. The time frame was very challenging, (eight weeks from order to location on site) and there were complications and challenges as a consequence of another contractor on site. McAvoy were able to manage all of the risks and issues professionally, effectively
and communicated with the School, other parties and the Local Authority extremely well throughout the project.”

Opening Quotes
Paul Atkins
Education Capital Programme Manager
Closing Quotes
Southampton City Council

Have Any Questions?

To find out more about The McAvoy Group, of if you have any questions about our projects then contact us today for further information.