Clever Class!
CleverClass is a range of innovative, energy-efficient, comfortable, plug and play modular buildings made specifically for the education sector. Their clever off-site construction can result in savings in the region of £40 a week in running costs alone, making them the intelligent cost-effective choice for education authorities.
Modular Construction vs Traditional
Build Increasingly unpredictable population changes, wavering budgets and limited times to complete Programmes of Build, make modular construction an ideal solution for many education authorities. Design flexibility is central to this offer and is perfect for expansion or reduction of a school site. The strength and durability of our modular buildings also facilitates the remodelling and relocation of anything from secure storage to classrooms and even entire schools.
Experience
We have been working within the education sector for the last 35 years, so we understand the challenges it is facing. A watchful eye on public spending, fluctuating populations and restrictive budgets have to be balanced with the need for energy efficient, comfortable, safe buildings with digital technology capabilities. CleverClass is our solution.
What makes us different?
We are a nationwide service with a proven track record who provide a complete turnkey solution from design to completion. Thanks to a continual renewal process, the average age of our modular fleet is less than 3 years. Our dedicated contract managers, exceptional customer services and streamlined ordering processes make dealing with us every bit as easy and efficient, as a CleverClass modular building.
Made for Maximum Energy Efficiency
The McAvoy Group uses some of the very latest off-site manufacturing techniques to make modular buildings the intelligent choice for the energy aware authority. Both of our modular options pass all local authority building and fire regulations and have been designed in line with the Simple Building Energy Model (SBEM). They have therefore reached all the building regulations and standards associated with air leakage, insulation values and heating systems.
Specifications
• Increased levels of air tightness can be achieved – fewer CO2 emissions
• Improved wall, floor and ceiling insulation – Reduced heating costs (U Values for external walls = 0.25W/m2K, floor = 0.25W/m2K, roof = 0.21W/m2K)
• Optional Gas fired, timed wet heating system – Lower running costs and CO2 emissions
• Dual flush toilets – Reduces unnecessary water consumption
• PIR Sensor lights – Reduces unnecessary electricity consumption
Faster from Order to Delivery
Because we do more off-site, we can deliver the final product to you faster. We aim to complete our Programme of Build from ordering to build within 6 weeks and a subsequent erection on site within 1 week. For example, a single classroom can be delivered onsite in two loads on a 45 ft trailer. The installation of standard fittings like a gas powered, thermostatically controlled wet-heating system and vinyl flooring is completed in the factory for a neater look. Plus, our quality controlled off-site fast-track plant assembly means that every building has a consistently high level of quality.
Smart Service!
Thanks to our nationwide service, we are able to provide customer service throughout the UK & Ireland and have done so for over 35 years. After installing a modular solution, we always make a site visit after 4 weeks to answer any queries you might have and our dedicated contract service manager, planned maintenance schedule and 24 hour call out service means that you will always have a point of contact, no matter what the problem might be. Dealing with us is every bit as easy and efficient, as a CleverClass modular building.



